Fixing Steel Furring Strips to the Structure
This image is for demonstration purposes only and ALL information contained in our Product Guide must be used for proper installation
Installation Instructions
 
 

Steel Furring

 

Location of Fixed Points

 

The steel furring must be attached with fixed points (#1) and the rest of the holes are drilled oversize (#2) to allow for expansion and contraction of the steel.

The Fixed Points (#1) of the steel furring strips must be attached to the structure in the same horizontal level so movements in the horizontal and vertical directions are eliminated. The other attachment points (#2) are pre-drilled oversized to allow for movements in the vertical but not the horizontal direction. This will allow the steel to only expand in one direction.

   
Fixing of Steel

 

 

 

Downloads and Links

Image Gallery

Accessories

 

The Product Guide (10 MB) should be downloaded for use during installation. Hard copies are available and should be requested through our Sample Request

    -   Product Guide   -   Release Form   -  Technical Data  -   Silbonit Fire Classification   -   Silbonit MSDS   -  3-Part Specifications  -  

  - Home   -   Products   -   Preparation   -   Installation Instructions   -   Installation Details   -   Warranty  -   Image Gallery   -   Our Affiliates   -   Contact Us -

-   Sample Request   -   Quote Request   -   Order Request   -   Find an Installer    -   Become an Installer   -   Accessories   -   Fabrication   -   Inventory    -   Current Events   -