Before you Begin
 
Preparation

Receipt of the Material

Inspection of the Material

We use common carriers for delivery, so access to the job site must be such that deliveries can be made by a full 18 wheel flat-bed or an enclosed tractor trailer. It is the recipient's responsibility for unloading the material so provisions must be arranged prior to the delivery. The delivery driver will call 24 hours before making the drop to schedule the delivery.

It is the recipient's responsibility to check that all materials received are not damaged and in accordance with the order submitted. Any damaged material must be specified IN WRITING and on the bill of lading when the delivery driver is still present. A copy of the bill of lading with the remarks must be submitted to the driver at the time of delivery.

Handling the Material

Storing the Material

Correct Way to Lift

Incorrect Way to Lift

The material must be kept in a dry, well ventilated area, off the ground and on a level surface at all times. Extended storage must take place in a dry and ventilated building so that no precipitation or condensation moisture is allowed to contact the material. Flat panels that are allowed to get wet while in stacks may result in permanent damage that would not occur if properly stored.

The sheets must be lifted, not dragged off the stack.

Correct Way to Carry

Incorrect Way to Carry

The sheets must be carried by two people and by the edge.

Before You Begin

 

 

 

Downloads and Links

Permission to Photograph

 

 

 

    -   Product Guide   -   Release Form   -  Technical Data  -   Silbonit Fire Classification   -   Silbonit MSDS   -  3-Part Specifications  -  

  - Home   -   Products   -   Preparation   -   Installation Instructions   -   Installation Details   -   Warranty  -   Image Gallery   -   Our Affiliates   -   Contact Us -

-   Sample Request   -   Quote Request   -   Order Request   -   Find an Installer    -   Become an Installer   -   Accessories   -   Fabrication   -   Inventory    -   Current Events   -